私密按摩高潮10次会得白血病吗,成全视频观看免费高清,午夜家庭影院,一二三四高清在线观看视频中文

中文版 | English |
Home > News > Industry news > Steel bar cutting machine operation process, the need to pay attention to

News

Steel bar cutting machine operation process, the need to pay attention to

* 來源: * 作者: admin * 發(fā)表時間: 2015-07-15 8:26:32 * 瀏覽: 67
Steel cutting machine operation, need to pay attention to what aspects
(1) the shuttle is expected to work surface with lower level of the blade and the length of the table can be determine according to processing material length.
(2) before the start, should check and confirm there is no crack, cutter head bolts, shield. Then turn the pulley by hand, check the gear backlash, adjust the cutting knife gap.
(3) after start-up, should be idle running, check the transmission part and bearing after normal operation before operation.
(4) mechanical fails to reach the normal speed, shall not be cut. Blanking, should be used, the position of the cutter, clenched reinforced on the blade quickly into, the operator should stand at the side of the fixed blade forcibly pressure bar, should prevent the steel bar end pop-up cuts. It is forbidden to hold reinforced with two points on either side of the blade leaning over feeding.
(5) shall not be shear diameter and strength more than machinery nameplate burn the red rules of steel and steel bar. A cutting steel bar, the more the total cross-sectional area shall be within the prescribed scope.
(6) shear low alloy steel, high hardness cutter should be changed, shear diameter should comply with the regulations of machinery nameplate.
(7) cut short material, the distance between the hand and the knife should be kept in more than 150 mm, such as hand side is less than 400 mm, the casing or fixture should be adopted to reinforced short head pressure or clip.
(8) during operation, it is forbidden to remove cutter by hand directly near the severed head and sundry. Steel swing around and around the cutter, can not stay not operation personnel.
(9) is abnormal when found machinery, have abnormal sound or cutter deflection, should immediately stop overhaul.
(10) after operation, cut off the power, steel brush to remove debris between the cutter, on the whole machine cleaning lubrication.
(11) hydraulic transmission type cutting machine work before, should check and confirm the hydraulic oil level and direction of rotation motor meets the requirements. After start-up, should no-load running, open pine oil valve, net of air inside the hydraulic cylinder, before being cut.
(12) manual hydraulic cutting machine before use, oil drain valve should be tighten, clockwise cutting finished, should immediately press anticlockwise unscrew. Job, should hold steady hand cutter, and good wear insulating gloves.


主站蜘蛛池模板: 介休市| 临沧市| 墨竹工卡县| 芜湖市| 新巴尔虎左旗| 衡阳市| 扬州市| 信阳市| 沙田区| 沈阳市| 文成县| 孟津县| 恩平市| 兴文县| 贡觉县| 仪陇县| 乡城县| 金塔县| 敦煌市| 电白县| 丹东市| 咸阳市| 永登县| 汉阴县| 息烽县| 南川市| 望城县| 东阿县| 武平县| 白城市| 曲沃县| 门头沟区| 突泉县| 融水| 桑日县| 霍邱县| 牙克石市| 西畴县| 彰武县| 海宁市| 雷波县|